The Intent Ledger

Blog

Project memory, decision intelligence, and source-backed records for design teams.

Commitment Tracking: 7 Fields That Let Design Teams Verify Promises

Commitment Tracking: 7 Fields That Let Design Teams Verify Promises

See how design teams track commitments with seven fields, verify promises across Slack, email, and tickets, and preserve project context with The Intent...

Decisions Backed by Sources: Six Steps Design Teams Can Audit

Decisions Backed by Sources: Six Steps Design Teams Can Audit

See how design teams tie decisions to exact source passages, separate facts from assumptions, and build records ready for audit with The Intent Ledger.

Decision Traceability: Six AI Audit Steps for Design Teams

Decision Traceability: Six AI Audit Steps for Design Teams

Learn how design and innovation teams capture six audit fields and map decision records to the EU AI Act, ISO/IEC 42001, and NIST AI RMF for audits.

Link Drawings to Decisions With 10 Fields Mapped to ISO 19650

Link Drawings to Decisions With 10 Fields Mapped to ISO 19650

Connect decisions to drawing revisions and source conversations with a copyable 10 field ILM Record, four workflow steps, and ISO 19650 and RIBA alignment.

Tag Meeting Notes: 6 Required Fields for Design Teams

Tag Meeting Notes: 6 Required Fields for Design Teams

Make meeting notes searchable with six required tags, a live workflow, and governance rules for design and project teams to find decisions faster.

Stop Losing Context: Decision First Architecture Project Documentation

Stop Losing Context: Decision First Architecture Project Documentation

Make architecture project documentation decision-first and stage-aware. Use one-page ADR+FSE templates, capture decisions in meetings, finalize within 48...

Shorten Onboarding: Project Context Retention for Studios, Adopt Today

Shorten Onboarding: Project Context Retention for Studios, Adopt Today

Studio how to preserve design decisions: a compact what/how/why template, a lightweight meeting to record workflow, and a cadence you can adopt today.

Cut Rework With Traceable Design Feedback in 90 Days, Research Backed

Cut Rework With Traceable Design Feedback in 90 Days, Research Backed

A research backed playbook for traceable design feedback: copyable decision-record schema, evidence from classroom and prototype studies, and a 90 day...

Convert Meeting Notes to Decision Logs in an Afternoon for Designers

Convert Meeting Notes to Decision Logs in an Afternoon for Designers

Turn meeting notes into searchable decision log entries in an afternoon, with copyable templates and a simple workflow tailored for design teams.

10-Field Client Approval Record Design Teams Can Make in Two Minutes

10-Field Client Approval Record Design Teams Can Make in Two Minutes

Use a 10-field client approval record and a two-minute meeting-close ritual to lock decisions, reduce rework, and keep design intent traceable with The...

Save Days: Designer Onboarding Documentation Built on Decision Records

Save Days: Designer Onboarding Documentation Built on Decision Records

Turn ADR-style decision records into a living project log designers actually use. Includes time-boxed meeting rhythm, copyable templates, and a 48 hour...

Action Item Traceability: Meeting Transcript Analysis for Design Teams

Action Item Traceability: Meeting Transcript Analysis for Design Teams

Adopt an action item driven, evidence backed AI pipeline to extract decisions, owners, risks, and open questions from meeting transcripts and archive...